1. Project Title : Design and development of DSP / FPGA based digital controller for hybrid active power filter applied to Industrial non-linear loads in distribution system.
Sponsoring Agency : SERB-DST
PI : Prof. Gayadhar Panda
Department : Electrical Engineering
Sanction Amount : 22,98,000.00
Financial year of Sanction : 2011-2012
StartYr/EndYr/Duration : NA
Duration : 3 years
Status : Completed

2. Project Title : Rehabilitation of RC beam-column connections by epoxy resin injection and FRP sheets wrapping
Sponsoring Agency : SERB-DST
PI : Dr. Comingstarful Marthong
Department : Civil Engineering
Sanction Amount : 20,88,000.00
Financial year of Sanction : 2014-2015
StartYr/EndYr/Duration : NA
Duration : 3 Years
Status : Completed

3. Project Title : Biodegradation of pulp and paper mill waste using different composting techniques
Sponsoring Agency : SERB-DST
PI : Dr. Meena Khwairakpam
Department : Civil Engineering
Sanction Amount : 32,93,000.00
Financial year of Sanction : 2014-2015
StartYr/EndYr/Duration : NA
Duration : 3 Years
Status : Completed

4. Project Title : Technology Transfer of Betel Nut cutter and Briquette making machine
Sponsoring Agency : Rural Technology Action Group (RuTAG-NE)
PI : Dr. Deba Kumar Sarma
Department : Mechanical Engineering
Sanction Amount : 1,80,000.00
Financial year of Sanction : 2015-2016
StartYr/EndYr/Duration : NA
Duration : 1 year
Status : Completed

5. Project Title : Seismic vulnerability assessment of school buildings of East Khasi Hills District of Meghalaya and the methods for reducing it
Sponsoring Agency : SDMA-Govt. of Meghalaya
PI : Dr. Comingstarful Marthong
Department : Civil Engineering
Sanction Amount : 9,12,000.00
Financial year of Sanction : 2015-2016
StartYr/EndYr/Duration : NA
Duration : 2 years
Status : Completed

6. Project Title : Efficient Multi-dimensional Qubit Placement in Quantum Circuits
Sponsoring Agency : SERB-DST
PI : Dr. Kamalika Datta
Department : Computer Science And Engineering
Sanction Amount : 14,82,900.00
Financial year of Sanction : 2015-2016
StartYr/EndYr/Duration : NA
Duration : 3 years
Status : Completed

7. Project Title : Ultra Low Power Multi Array 64K X 16 Dual Bit associative memory with partial matching capability
Sponsoring Agency : SERB-DST
PI : Dr. Anup Dandapat
Department : Electronics & Communication Engineering
Sanction Amount : 26,30,000.00
Financial year of Sanction : 2015-2016
StartYr/EndYr/Duration : NA
Duration : 3 years
Status : Completed

8. Project Title : Transition metal catalyzed cleavage of carbon-carbon bonds: synthetic, mechanistic and theoretical studies
Sponsoring Agency : SERB-DST
PI : Dr. Paresh Nath Chatterjee
Department : Chemical & Biological Sciences
Sanction Amount : 24,70,000.00
Financial year of Sanction : 2015-2016
StartYr/EndYr/Duration : NA
Duration : 3 years
Status : Completed

9. Project Title : Development of 3-D Supramolecular Structure-Based Optoelectronic Materials Towards Photovoltaic Devices
Sponsoring Agency : DST _ Indo Korea
PI : Dr. Gitish Kishor Dutta
Department : Chemical & Biological Sciences
Sanction Amount : 2765560
Financial year of Sanction : 2015-2016
StartYr/EndYr/Duration : NA
Duration : 3 years
Status : Completed

10. Project Title : Diketopyrrolopyrrole and isoindigo based luminescent conjugated polymers for colorimetric and fluorogenic sensors
Sponsoring Agency : SERB-DST
PI : Dr. Gitish Kishor Dutta
Department : Chemical & Biological Sciences
Sanction Amount : 22,38,000.00
Financial year of Sanction : 2015-2016
StartYr/EndYr/Duration : NA
Duration : 3 years
Status : Completed

11. Project Title : Special Manpower Development Programme for Chips to System Design (SMDP-C2SD)
Sponsoring Agency : MeitY
PI : Dr. Anup Dandapat
Department : Electronics & Communication Engineering
Sanction Amount : 94,04,000.00
Financial year of Sanction : 2015-2016
StartYr/EndYr/Duration : NA
Duration : 5 years
Status : Completed

12. Project Title : Pulses in Spatial Population Dynamics
Sponsoring Agency : Indo-French Centre for Applied Mathematics (IFCAM)
PI : Dr. Bapan Ghosh
Department : Mathematics
Sanction Amount : 7,00,000.00
Financial year of Sanction : 2015-2016
StartYr/EndYr/Duration : NA
Duration : 1 year
Status : Transfer

13. Project Title : Modeling and Control of the hydraulically actuated Ring Inlet Guide Vane of Francis Turbine by Adaptive Neural Network Sliding mode Controller Design
Sponsoring Agency : DST-SERB
PI : Dr. Bikash Kumar Sarkar
Department : Mechanical Engineering
Sanction Amount : 30,42,600.00
Financial year of Sanction : 2015-2016
StartYr/EndYr/Duration : NA
Duration : 3 year
Status : Completed

14. Project Title : Parallel Model Checking of Hybrid Systems
Sponsoring Agency : SERB-DST
PI : Dr. Rajarshi Ray
Department : Computer Science And Engineering
Sanction Amount : 21,75,600.00
Financial year of Sanction : 2015-2016
StartYr/EndYr/Duration : NA
Duration : 3 years

15. Project Title : Investigation of Dynamic Reconfigurable Issues in Cryptographic Algorithm Implementation on FPGA Platform
Sponsoring Agency : DEITY
PI : Dr. Kamalika Datta
Department : Computer Science And Engineering
Sanction Amount : 15,00,000.00
Financial year of Sanction : 2015-2016
StartYr/EndYr/Duration : NA
Duration : 1 year 3 months
Status : Completed

16. Project Title : Design Innovation Center (DIC)-Spoke
Sponsoring Agency : MHRD through DIC (HUB) IITGuwahati
PI : Dr. D.K. Sarma
Department : Mechanical Engineering
Sanction Amount : 1,00,00,000.00
Financial year of Sanction : 2016-2022
StartYr/EndYr/Duration : NA
Duration : 5 years
Status : Ongoing

17. Project Title : Provision of Frequency Regulation using V2G Control and HVDC transmission Links with Virtual Synchronous Power concept
Sponsoring Agency : SERB-DST
PI : Dr. Sanjoy Debbarma
Department : Electrical Engineering
Sanction Amount : 10,00,000.00
Financial year of Sanction : 2016-2017
StartYr/EndYr/Duration : NA
Duration : 2 years
Status : Completed

18. Project Title : Smart Biomimetic molecular crystal of energy conversion
Sponsoring Agency : SERB-DST
PI : Dr. Naba Kamal Nath
Department : Chemical & Biological Sciences
Sanction Amount : 37,07,000.00
Financial year of Sanction : 2016-2017
StartYr/EndYr/Duration : NA
Duration : 3 years
Status : Completed

19. Project Title : An investigation into the molecular interaction of dietary polyphenols with hen egg white lysozyme using biophysical techniques
Sponsoring Agency : SERB-DST
PI : Dr. Atanu Singha Roy
Department : Chemical & Biological Sciences
Sanction Amount : 36,69,000.00
Financial year of Sanction : 2016-2017
StartYr/EndYr/Duration : NA
Duration : 3 Years
Status : Completed

20. Project Title : Modeling, Dynamics and Benefits of Marine Protected Areas
Sponsoring Agency : SERB DST (indo-Russian)
PI : Dr. Bapan Ghosh
Department : Mathematics
Sanction Amount : 14,69,600.00
Financial year of Sanction : 2016-2017
StartYr/EndYr/Duration : NA
Duration : 3 year
Status : Transfer

21. Project Title : Synchrophasor Sensing and Seamless Control of Smart Distribution Network with Renewable Energy Integration
Sponsoring Agency : RECTPCL
PI : Prof. Gayadhar Panda
Department : Electrical Engineering
Sanction Amount : 1,31,75,000.00
Financial year of Sanction : 2016-2017
StartYr/EndYr/Duration : NA
Duration : 3 years
Status : Ongoing

22. Project Title : Development of CAD Tools for Synthesis, Optimization and Verification of Digital Circuits using Memristors (Indo-Austria)
Sponsoring Agency : SERB-DST
PI : Dr. Kamalika Datta
Department : Computer Science And Engineering
Sanction Amount : 8,65,500.00
Financial year of Sanction : 2016-2017
StartYr/EndYr/Duration : NA
Duration : 2 Years
Status : Completed

23. Project Title : Thermal Detection of Malignancy and Estimation of Its Properties in a Human Breast
Sponsoring Agency : SERB-DST
PI : Dr. Koushik Das
Department : Mechanical Engineering
Sanction Amount : 17,45,984.00
Financial year of Sanction : 2016-2017
StartYr/EndYr/Duration : NA
Duration : 3 Years
Status : Completed

24. Project Title : Novel Biocompatible Nanocomposites for SERS Based Sensing of Biomolecules and Toxic Metal Ions
Sponsoring Agency : SERB-DST
PI : Dr. Mukul Pradhan
Department : Chemical & Biological Sciences
Sanction Amount : 83,00,000.00
Financial year of Sanction : 2016-2017
StartYr/EndYr/Duration : NA
Duration : 5 Years
Status : Transfer

25. Project Title : Cost effective combination of t-head groynes for river bank protection
Sponsoring Agency : SERB-DST
PI : Dr. Hriday Mani Kalita
Department : Civil Engineering
Sanction Amount : 19,16,150.00
Financial year of Sanction : 2016-2017
StartYr/EndYr/Duration : NA
Duration : 3 years
Status : Completed

26. Project Title : Design & development of an intelligent controller for a Vienna Rectifier based grid-connected hybrid energy conversion system comprising of wind & solar energy sources.
Sponsoring Agency : SERB-DST
PI : Dr. Atanu Banerjee
Department : Electrical Engineering
Sanction Amount : 32,77,560.00
Financial year of Sanction : 2016-2017
StartYr/EndYr/Duration : NA
Duration : 3 years
Status : Completed

27. Project Title : Studies on Orthoconic Anti-ferroelectric liquid crystals
Sponsoring Agency : SERB-DST
PI : Dr. Ayon Bhattacharjee
Department : Physics
Sanction Amount : 20,05,520.00
Financial year of Sanction : 2016-2017
StartYr/EndYr/Duration : NA
Duration : 3 Years
Status : Completed

28. Project Title : Modelling and control of the hydraulically actuated ring inlet guide vane of Francis Turbine by Adaptive Neural Network sliding mode Controller Design
Sponsoring Agency : SERB-DST
PI : Dr. Bikash Kumar Sarkar
Department : Mechanical Engineering
Sanction Amount : 30,42,600.00
Financial year of Sanction : 2016-2017
StartYr/EndYr/Duration : NA
Duration : 3 years
Status : Completed

29. Project Title : Application of masking technique and reverse EDM Technique for pattern generation by selective area deposition of material using Powder metallurgical green compact tool and sintered tool electrode
Sponsoring Agency : SERB-DST
PI : Dr. Maneswar Rahang
Department : Mechanical Engineering
Sanction Amount : 2784490
Financial year of Sanction : 2017-2018
StartYr/EndYr/Duration : NA
Duration : 3 years
Status : Completed

30. Project Title : Molecular interactions of the antioxidant polyphenols and their copper complexes with human serum albumin and its glycated analogues
Sponsoring Agency : CSIR
PI : Dr. Atanu Singha Roy
Department : Chemical & Biological Sciences
Sanction Amount : 6,90,000.00
Financial year of Sanction : 2017-2020
StartYr/EndYr/Duration : NA
Duration : 3 Year
Status : Completed

31. Project Title : Application of masking technique and reverse EDM Technique for pattern generation by selective area deposition of material using Powder metallurgical green compact tool and sintered tool electrode
Sponsoring Agency : SERB-DST
PI : Dr. Maneswar Rahang
Department : Mechanical Engineering
Sanction Amount : 27,84,490.00
Financial year of Sanction : 2017-2018
StartYr/EndYr/Duration : NA
Duration : 3 years
Status : Completed

32. Project Title : Structural Behaviour of Lean duplex stainless steel Tubular Beams with web opening
Sponsoring Agency : SERB-DST
PI : Dr. M. Longshithung Patton
Department : Civil Engineering
Sanction Amount : 19,03,990.00
Financial year of Sanction : 2017-2018
StartYr/EndYr/Duration : NA
Duration : 3 years
Status : Completed

33. Project Title : Investigation of Dielectric Properties towards assessment of cros-linked Ployethylene (XLPE) Cable Insulation using Dielectric Response Analysis
Sponsoring Agency : SERB-DST
PI : Dr. Supriyo Das
Department : Electrical Engineering
Sanction Amount : 32,40,072.00
Financial year of Sanction : 2017-2018
StartYr/EndYr/Duration : NA
Duration : 3 years
Status : Completed

34. Project Title : Molecular interactions of the antioxidant polyphenols and their copper complexes with human serum albumin and its glycated analogues
Sponsoring Agency : CSIR
PI : Dr. Atanu Singha Roy
Department : Chemical & Biological Sciences
Sanction Amount : 6,90,000.00
Financial year of Sanction : 2017-2018
StartYr/EndYr/Duration : NA
Duration : 3 Years
Status : Completed

35. Project Title : Cloud-assisted Data Analytics based Real-Time Monitoring and Detection of Water Leakage in Transmission Pipelines using Wireless Sensor Network for Hilly Regions
Sponsoring Agency : NMHS
PI : Dr. Vipin Pal
Department : Computer Science And Engineering
Sanction Amount : 44,70,880.00
Financial year of Sanction : 2017-2018
StartYr/EndYr/Duration : NA
Duration : 3 Years
Status : Completed

36. Project Title : Feasibility study on use of locally available material (low-grade aggregates) for road construction (BRO project Pushpak in Mizoram)
Sponsoring Agency : BRO, Shillong
PI : Dr. Comingstarful Marthong
Department : Civil Engineering
Sanction Amount : 4,95,600.00
Financial year of Sanction : 2017-2018
StartYr/EndYr/Duration : NA
Duration : 1 years
Status : Completed

37. Project Title : Post processing of NQR signals in digital domain in FPGA
Sponsoring Agency : GOI, Board of Research in Nuclear Sciences (BRNS)
PI : Dr. P. Rangababu
Department : Electronics & Communication Engineering
Sanction Amount : 20,03,000.00
Financial year of Sanction : 2018-2019
StartYr/EndYr/Duration : NA
Duration : 2 years
Status : Ongoing

38. Project Title : QM + MM Chemical Dynamics on Chemical Reactions and Non-Adiabatic Processes in Condensed Phase Molecular Systems
Sponsoring Agency : SERB-DST
PI : Dr. Amit Kumar Paul
Department : Chemical & Biological Sciences
Sanction Amount : 36,58,000.00
Financial year of Sanction : 2018-2019
StartYr/EndYr/Duration : NA
Duration : 3 years
Status : Completed

39. Project Title : Non-contact method of vibration as well as velocity parametres estimation based on goertzel algorithm in PLL Technique
Sponsoring Agency : SERB-DST
PI : Dr. Ksh Milan Singh
Department : Electrical Engineering
Sanction Amount : 30,18,000.00
Financial year of Sanction : 2018-2019
StartYr/EndYr/Duration : NA
Duration : 3 years
Status : Ongoing

40. Project Title : Phonetic and psosodic analysis of Khasi language
Sponsoring Agency : SERB-DST
PI : Dr. Ch. V Rama Rao
Department : Electronics & Communication Engineering
Sanction Amount : 16,13,280.00
Financial year of Sanction : 2018-2019
StartYr/EndYr/Duration : NA
Duration : 3 Years
Status : Ongoing

41. Project Title : Investigation on Data-Driven Event Detection using Indian Power Grid's Synchrophasor Data.
Sponsoring Agency : SERB-DST
PI : Dr. Diptendu Sinha Roy
Department : Computer Science And Engineering
Sanction Amount : 19,41,060.00
Financial year of Sanction : 2018-2019
StartYr/EndYr/Duration : NA
Duration : 3 Years
Status : Ongoing

42. Project Title : K-Fusion Frames- Applications to Sensor Network and Coding Theory
Sponsoring Agency : SERB-DST
PI : Dr. Saikat Mukherjee
Department : Mathematics
Sanction Amount : 6,60,000.00
Financial year of Sanction : 2018-2019
StartYr/EndYr/Duration : NA
Duration : 3 years
Status : Completed

43. Project Title : Iterative methods for solving non-square linear systems
Sponsoring Agency : SERB-DST
PI : Dr. Manideepa Saha
Department : Mathematics
Sanction Amount : 17,48,560.00
Financial year of Sanction : 2018-2019
StartYr/EndYr/Duration : NA
Duration : 3 years
Status : Completed

44. Project Title : Fluid dynamical aspects in nuclearing of laser produced nanoparticles in liquids
Sponsoring Agency : SERB-DST
PI : Dr. Arpita Nath
Department : Physics
Sanction Amount : 51,66,893.00
Financial year of Sanction : 2018-2019
StartYr/EndYr/Duration : NA
Duration : 3 years
Status : Ongoing

45. Project Title : On LU-factorization of Generalized M-matrices", funded by Department of Atomic Energy-NBHM.
Sponsoring Agency : Atomic Energy-NBHM.
PI : Dr. Manideepa Saha
Department : Mathematics
Sanction Amount : 14,33,600.00
Financial year of Sanction : 2018-2019
StartYr/EndYr/Duration : NA
Duration : 3 years
Status : Completed

46. Project Title : Development of High Sensitivity CMOS-MEMS Integrated Pressure Sensor and System for Space Application
Sponsoring Agency : ISRO
PI : Dr. Pradeep Kumar Rathore
Department : Electronics & Communication Engineering
Sanction Amount : 32,46,000.00
Financial year of Sanction : 2018-2019
StartYr/EndYr/Duration : NA
Duration : 2 years
Status : Ongoing

47. Project Title : Real Time Control and Energy management for Seamless Operation of DC Microgrid in Grid - Connected and stand Alone
Sponsoring Agency : SERB-DST
PI : Prof. Gayadhar Panda
Department : Electrical Engineering
Sanction Amount : 44,56,450.00
Financial year of Sanction : 2018-2019
StartYr/EndYr/Duration : NA
Duration : 3 years
Status : Ongoing

48. Project Title : Design & Development of a Cost- effective & Energy- efficient Grid- connected Pumped Hydro System employed with Sensor-less PMBLDCM
Sponsoring Agency : CPRI
PI : Dr. Atanu Banerjee
Department : Electrical Engineering
Sanction Amount : 32,90,000.00
Financial year of Sanction : 2018-2019
StartYr/EndYr/Duration : NA
Duration : 2 years
Status : Completed

49. Project Title : Masking of interfering sounds in a crowded environment for hearing aid appilcations
Sponsoring Agency : SERB-DST
PI : Dr. Ch. V Rama Rao
Department : Electronics & Communication Engineering
Sanction Amount : 23,46,447.00
Financial year of Sanction : 2018-2019
StartYr/EndYr/Duration : NA
Duration : 3 years
Status : Ongoing

50. Project Title : Tensionmeter based automated IoT system for irrigation
Sponsoring Agency : DDP-DST
PI : Dr. Shubhankar Majumdar
Department : Electronics & Communication Engineering
Sanction Amount : 16,84,941.00
Financial year of Sanction : 2019-2021
StartYr/EndYr/Duration : NA
Duration : 3 years
Status : Completed

51. Project Title : Prediction Detection and Monitoring System for Landslide in Hilly Region
Sponsoring Agency : DST-IBCD (International Bilateral Cooperation Div
PI : Dr. Shubhankar Majumdar
Department : Electronics & Communication Engineering
Sanction Amount : 6,26,000.00
Financial year of Sanction : 2019-2021
StartYr/EndYr/Duration : NA
Duration : 3 Years
Status : Completed

52. Project Title : Instrumentation, Real Time- Monitoring and Remediation of a steep soil slope stability in Meghalaya
Sponsoring Agency : SERB-DST
PI : Dr. Smrutirekha Sahoo
Department : Civil Engineering
Sanction Amount : 35,03,500.00
Financial year of Sanction : 2019-2020
StartYr/EndYr/Duration : NA
Duration : 3 Years
Status : Ongoing

53. Project Title : Synthesis of biocompatible silver and gold nanoparticles using dietary polyphenols as reducing agents: Further investigation into their binding efficacies with the carrier proteins, biomolecular, detections, anti-bacterial properties and cell cytotoxicity
Sponsoring Agency : SERB-DST
PI : Dr. Atanu Singha Roy
Department : Chemical & Biological Sciences
Sanction Amount : 25,12,400.00
Financial year of Sanction : 2019-2020
StartYr/EndYr/Duration : NA
Duration : 3 Years
Status : Completed

54. Project Title : The Use of e-Writers in Teaching Writing Skill to Special Students of Dwar Jingkyrmen
Sponsoring Agency : ICSSR, New Delhi
PI : Dr. P. S. Mangang
Department : Humanities & Social Sciences
Sanction Amount : 4,00,000/-
Financial year of Sanction : 2019-2020
StartYr/EndYr/Duration : NA
Duration : 1 year
Status : Completed

55. Project Title : Assesment of climate change impact on soils and various water of Meghalaya using existing and newer techniques
Sponsoring Agency : DST - CCP
PI : Dr. Paresh Nath Chatterjee
Department : Chemical & Biological Sciences
Sanction Amount : 66,45,175.00
Financial year of Sanction : 2019-2020
StartYr/EndYr/Duration : NA
Duration : 3 year
Status : Completed

56. Project Title : Development of low cost fully -Biodegradable plastic-Bambo Board for structural application
Sponsoring Agency : SCSTE, Meghalaya
PI : Dr. Kishore Debnath
Department : Mechanical Engineering
Sanction Amount : 1,00,000.00
Financial year of Sanction : 2019-2020
StartYr/EndYr/Duration : NA
Duration : 1 year
Status : Completed

57. Project Title : Development and Characterization of Ternary Blended Geopolymer Concrete: A sustainable materials for green construction and technology
Sponsoring Agency : SCSTE, Meghalaya
PI : Dr. Dibyendu Adak
Department : Civil Engineering
Sanction Amount : 99,275.00
Financial year of Sanction : 2019-2020
StartYr/EndYr/Duration : NA
Duration : 1 year
Status : Completed

58. Project Title : Design and fabrication of hand and foot-powered Grain Segregator
Sponsoring Agency : SCSTE, Meghalaya
PI : Dr. Maneswar Rahang
Department : Mechanical Engineering
Sanction Amount : 72,600.00
Financial year of Sanction : 2019-2020
StartYr/EndYr/Duration : NA
Duration : 1 year
Status : Completed

59. Project Title : Design and fabrication of Grain Dryer Machine
Sponsoring Agency : SCSTE, Meghalaya
PI : Dr. Maneswar Rahang
Department : Mechanical Engineering
Sanction Amount : 95,700.00
Financial year of Sanction : 2019-2020
StartYr/EndYr/Duration : NA
Duration : 1 year
Status : Completed

60. Project Title : Master Node Design for Wireless Body Area Network (WBAN)
Sponsoring Agency : SCSTE, Meghalaya
PI : Dr. Ksh Milan Singh
Department : Electrical Engineering
Sanction Amount : 99,960.00
Financial year of Sanction : 2019-2020
StartYr/EndYr/Duration : NA
Duration : 1 year
Status : Completed

61. Project Title : Differentiating Rooftop Rainwater harvesting
Sponsoring Agency : SCSTE, Meghalaya
PI : Dr. Susmita Sharma
Department : Civil Engineering
Sanction Amount : 47,960.00
Financial year of Sanction : 2019-2020
StartYr/EndYr/Duration : NA
Duration : 1 year
Status : Completed

62. Project Title : Lakshym Jal-The water filtration system
Sponsoring Agency : SCSTE, Meghalaya
PI : Dr. Susmita Sharma
Department : Civil Engineering
Sanction Amount : 42,900.00
Financial year of Sanction : 2019-2020
StartYr/EndYr/Duration : NA
Duration : 1 year
Status : Completed

63. Project Title : Solar Based Room Heater Cum food drier with energy Storage Unit
Sponsoring Agency : SCSTE, Meghalaya
PI : Dr. Rajat Subhra Das
Department : Mechanical Engineering
Sanction Amount : 97,834.00
Financial year of Sanction : 2019-2020
StartYr/EndYr/Duration : NA
Duration : 1 year
Status : Completed

64. Project Title : Development of electric carrier to transport the goods in rural Hilly Area
Sponsoring Agency : SCSTE, Meghalaya
PI : Dr. Rakesh Roy
Department : Electrical Engineering
Sanction Amount : 1,00,000.00
Financial year of Sanction : 2019-2020
StartYr/EndYr/Duration : NA
Duration : 1 year
Status : Completed

65. Project Title : Ground Improvement using Waste plastic-coated Bambo Grid (WPBG) Reinforced Soils
Sponsoring Agency : SCSTE, Meghalaya
PI : Dr. Smrutirekha Sahoo
Department : Civil Engineering
Sanction Amount : 1,00,000.00
Financial year of Sanction : 2019-2020
StartYr/EndYr/Duration : NA
Duration : 1 year
Status : Completed

66. Project Title : Cloud-Assisted Hybrid Renewable Energy Sources for Electricity and Water Supply in Rural Area
Sponsoring Agency : SCSTE, Meghalaya
PI : Dr. Shubhankar Majumdar
Department : Electronics & Communication Engineering
Sanction Amount : 99,748.00
Financial year of Sanction : 2019-2020
StartYr/EndYr/Duration : NA
Duration : 1 year
Status : Completed

67. Project Title : Smart Agro Modular System
Sponsoring Agency : SCSTE, Meghalaya
PI : Dr. Shubhankar Majumdar
Department : Electronics & Communication Engineering
Sanction Amount : 46,465.00
Financial year of Sanction : 2019-2020
StartYr/EndYr/Duration : NA
Duration : 1 year
Status : Completed

68. Project Title : Smart Blind Stick
Sponsoring Agency : SCSTE, Meghalaya
PI : Dr. Shubhankar Majumdar
Department : Electronics & Communication Engineering
Sanction Amount : 19,950.00
Financial year of Sanction : 2019-2020
StartYr/EndYr/Duration : NA
Duration : 1 year
Status : Completed

69. Project Title : A Self Sustained Multiple Sensor IoT Based Landslide Detector Early Warning System
Sponsoring Agency : SCSTE, Meghalaya
PI : Dr. Shubhankar Majumdar
Department : Electronics & Communication Engineering
Sanction Amount : 49,335.00
Financial year of Sanction : 2019-2020
StartYr/EndYr/Duration : NA
Duration : 1 year
Status : Completed

70. Project Title : A portable Wind-Hydro Hybrid Electronic Charger Targeted for Outdoor Activities and Military Applications
Sponsoring Agency : SCSTE, Meghalaya
PI : Dr. Shubhankar Majumdar
Department : Electronics & Communication Engineering
Sanction Amount : 49,742.00
Financial year of Sanction : 2019-2020
StartYr/EndYr/Duration : NA
Duration : 1 year
Status : Completed

71. Project Title : Multi-stimuli responsive smart crystalline material derived from organic molecular photoswitch"
Sponsoring Agency : SERB-DST
PI : Dr. Naba Kamal Nath
Department : Chemical & Biological Sciences
Sanction Amount : 31,72,400.00
Financial year of Sanction : 2019-2020
StartYr/EndYr/Duration : NA
Duration : 3 Years
Status : Completed

72. Project Title : Design & Development of High frequency Multilevel Resonant Inverter based New Generation Induction Heated Autoclave System for Sterilization of Surgical Instrumentssponsored by MEitY, Govt. of India under NaMPET-III
Sponsoring Agency : Meity
PI : Dr. Atanu Banerjee
Department : Electrical Engineering
Sanction Amount : 25,00,000.00
Financial year of Sanction : 2019-2020
StartYr/EndYr/Duration : NA
Duration : 2 years
Status : Ongoing

73. Project Title : Low cost faster & accurate low velocity impact damage imaging along with the depth profiling for carbon fibre reinforced composite materials using vibro-thermography
Sponsoring Agency : SERB-DST
PI : Dr. Tanmoy Bose
Department : Mechanical Engineering
Sanction Amount : 45,33,653.00
Financial year of Sanction : 2019-2020
StartYr/EndYr/Duration : NA
Duration : 3 years
Status : Transfer

74. Project Title : The Use of e-Writers in Teaching Writing Skill to Special Students of Dwar Jingkyrmen
Sponsoring Agency : ICSSR, New Delhi
PI : Dr. Paonam Sudeep Mangang
Department : Humanities & Social Sciences
Sanction Amount : 4,00,000.00
Financial year of Sanction : 2019-2020
StartYr/EndYr/Duration : NA
Duration : 1 year
Status : Completed

75. Project Title : Exploring High Density Magnetic Medium in Nanocrystalline Spinel Ferrites for Mganetic Recording Systems
Sponsoring Agency : DST-SERB
PI : Dr. Tribedi Bora
Department : Physics
Sanction Amount : 21,71,730.00
Financial year of Sanction : 2019-2020
StartYr/EndYr/Duration : NA
Duration : 3 Years
Status : Completed

76. Project Title : Post Transition State Dynamics on Chemical Reactions and the Effect of Solvation
Sponsoring Agency : CSIR
PI : Dr. Amit Kumar Paul
Department : Chemical & Biological Sciences
Sanction Amount : 13,96,000.00
Financial year of Sanction : 2019-2020
StartYr/EndYr/Duration : NA
Duration : 3 Years
Status : Completed

77. Project Title : Development of E-Mode III- Nitride devices for energy devices tride devices for energy optimized agile power electronics
Sponsoring Agency : DST/INT/Czech
PI : Dr. Shubhankar Majumdar
Department : Electronics & Communication Engineering
Sanction Amount : 2776906
Financial year of Sanction : 2020-2021
StartYr/EndYr/Duration : NA
Duration : 3 Years
Status : Ongoing

78. Project Title : Design of and Development of Intelligent Algorithms for Analysis and Detection of Obscene Content and Forgery in the Images Available in Social Media Platform
Sponsoring Agency : BPR&D
PI : Dr. Bunil Kumar Balabantaray
Department : Computer Science And Engineering
Sanction Amount : 2188800
Financial year of Sanction : 2020-2022
StartYr/EndYr/Duration : NA
Duration : 2 years
Status : Completed

79. Project Title : GAN-based Medical Image Dataset Synthesis for disease prediction
Sponsoring Agency : NVIDIA Hardware Grant
PI : Dr. Bunil Kumar Balabantaray
Department : Computer Science And Engineering
Sanction Amount : 1000000
Financial year of Sanction : 2020-2021
StartYr/EndYr/Duration : NA
Duration : Not Specified
Status : Ongoing

80. Project Title : A Machine Learning Framework for Deploying Mobile Edge Clouds for Real-Time Analytics on IoT Data over 5G
Sponsoring Agency : Ministry of Electronics & Information Technology E
PI : Dr. Diptendu Sinha Roy
Department : Computer Science And Engineering
Sanction Amount : 45,00,000.00
Financial year of Sanction : 2020-2021
StartYr/EndYr/Duration : NA
Duration : 3 years
Status : Ongoing

81. Project Title : Development of a novel solar driven dedicated outdoor air system (DOAS) for space heating and liquid desicant dehumidification with direct/indirect contact heat/mass exchangeers for Meghalaya region
Sponsoring Agency : SERB_DST
PI : Dr. Rajat Subhra Das
Department : Mechanical Engineering
Sanction Amount : 32,41,700.00
Financial year of Sanction : 2020-21
StartYr/EndYr/Duration : NA
Duration : 3 years
Status : Ongoing

82. Project Title : Design and Development of highly sensitive Non-Conventional Ring Channel Shaped MOSFET based current mirror integrated pressure sensors
Sponsoring Agency : DST/TDT/DDP
PI : Dr. Pradeep Kumar Rathore
Department : Electronics & Communication Engineering
Sanction Amount : 44,93,601.00
Financial year of Sanction : 2021-2022
StartYr/EndYr/Duration : NA
Duration : 3 years
Status : Ongoing

83. Project Title : Air Quality network for SMART City: Real-time air quality monitor, evaluation, and prediction of air pollutants using Machine Learning through the deployment of low-cost air quality sensor (LAQS) in India and two selected ASEAN countries (Malaysia, Philippines).
Sponsoring Agency : ASEAN-India STI Cooperation
PI : Dr. Shubhankar Majumdar
Department : Electronics & Communication Engineering
Sanction Amount : 26,25,696
Financial year of Sanction : 2021-2022
StartYr/EndYr/Duration : NA
Duration : 2 years
Status : Ongoing

84. Project Title : Bound on sterile neutrino decay width and mixing angle with active neutrino using global 21-cm absorption signal..
Sponsoring Agency : SERB-DST
PI : Dr. Alekha Chandra Nayak,
Department : Physics
Sanction Amount : 11,27,522.00
Financial year of Sanction : 2021-2022
StartYr/EndYr/Duration : NA
Duration : 2 years
Status : Ongoing

85. Project Title : Modeling of endothelial glycocalyx (EGL) and transport of low-density lipoprotein Modeling of endothelial glycocalyx (EGL) and transport of low-density lipoprotein (LDL) in artery: anisotropic porous medium approach.
Sponsoring Agency : SERB-DST
PI : Dr. Timir Karmakar,
Department : Mathematics
Sanction Amount : 13,73,372.00
Financial year of Sanction : 2021-2022
StartYr/EndYr/Duration : NA
Duration : 2 years
Status : Ongoing

86. Project Title : Development and Testing of Solar Photovoltaic (PV) Assisted Hybrid Double- Slope Desalination Solar Still for Off-grid Rural-North East India
Sponsoring Agency : SERB-DST
PI : Dr. Biplab Kumar Debnath
Department : Mechanical Engineering
Sanction Amount : 29,00,909.00
Financial year of Sanction : 2021-2022
StartYr/EndYr/Duration : NA
Duration : 3 years
Status : Ongoing

87. Project Title : A Deep Learning Approach for Preservation of Cultural Heritage
Sponsoring Agency : SERB-DST
PI : Dr. Bunil Kumar Balabantaray
Department : Computer Science And Engineering
Sanction Amount : 23,91,345.00
Financial year of Sanction : 2021-2022
StartYr/EndYr/Duration : NA
Duration : 3 years
Status : Ongoing

88. Project Title : Transport of a dimer in an inhomegenous ratchet with spatially varying friction coefficient
Sponsoring Agency : SERB-DST
PI : Dr. Wandahun Longtrai Reenbohn
Department : Physics
Sanction Amount : 35,03,791.00
Financial year of Sanction : 2021-2022
StartYr/EndYr/Duration : NA
Duration : 3 years
Status : Ongoing

89. Project Title : Coating of Hafnium on Copper to Use as Nuclear Reactor Control Rod
Sponsoring Agency : SERB-DST
PI : Dr. Maneswar Rahang
Department : Mechanical Engineering
Sanction Amount : 25,06,920.00
Financial year of Sanction : 2021-2022
StartYr/EndYr/Duration : NA
Duration : 3 years
Status : Ongoing

90. Project Title : Structural Integrity Assesment considering residual/ reactive stresses due to different welding configurations for high strength steel
Sponsoring Agency : NMRL
PI : Dr. Dababrata Podder
Department : Civil Engineering
Sanction Amount : 1000000
Financial year of Sanction : 2021-2022
StartYr/EndYr/Duration : NA
Duration : 18 months
Status : Ongoing

91. Project Title : Enhancement of Dermo Choice Application- UI Refinement, Computation API and Privacy Policy
Sponsoring Agency : CHOWIS, SOUTH KOREA
PI : Dr. Bunil Kumar Balabantaray
Department : Computer Science And Engineering
Sanction Amount : 205200
Financial year of Sanction : 2022
StartYr/EndYr/Duration : NA
Duration : 2 months
Status : Completed

92. Project Title : Performance Enhancement of Underwater Marine Propellers by use of Additional Appendages
Sponsoring Agency : TIH, IIT Guwahati
PI : Dr. Subhendu Maity
Department : Mechanical Engineering
Sanction Amount : 8,00,000 + JRF
Financial year of Sanction : 2022-2023
StartYr/EndYr/Duration : NA
Duration : 2 years
Status : Ongoing

93. Project Title : An artificial intelligence approach to solve waste management challenges
Sponsoring Agency : Ficha, France
PI : Dr. Bunil Kumar Balabantaray
Department : Computer Science And Engineering
Sanction Amount : 1,31,45,235
Financial year of Sanction : 2022-2024
StartYr/EndYr/Duration : NA
Duration : 2 years
Status : Ongoing

94. Project Title : Fully acoustics testing of low velocity impact damage in composite plate using the concept of local defect resonance
Sponsoring Agency : Ministry of Defence
PI : Dr. Tanmoy Bose
Department : Mechanical Engineering
Sanction Amount : 24,02,800.00
Financial year of Sanction : 2022-2023
StartYr/EndYr/Duration : NA
Duration : 3 years
Status : Transfer

95. Project Title : Photocurrent performance of ion implanted Iron Pyrite (FeS2) thin flim as hole transport layer for the CZTS based solar Cell
Sponsoring Agency : Inter-University Accelerator Centre
PI : Dr. K. Senthilkumar
Department : Physics
Sanction Amount : 1,41,935.00
Financial year of Sanction : 2022-2023
StartYr/EndYr/Duration : NA
Duration : 3 years
Status : Ongoing

96. Project Title : Extraction of Pineapple Leaf Fiber and Use It for the Development of Low-Cost Products
Sponsoring Agency : NECTAR
PI : Dr. Kishore Debnath
Department : Mechanical Engineering
Sanction Amount : 12,65,880.00
Financial year of Sanction : 2022-2023
StartYr/EndYr/Duration : NA
Duration : 1 year
Status : Ongoing

97. Project Title : Investigating Self-Healing Capability And Performance of HMA Mixes Containing Steel Slag As Aggregates
Sponsoring Agency : SERB
PI : Dr. Pradeep Kumar Gautam
Department : Civil Engineering
Sanction Amount : 3531000
Financial year of Sanction : 2022-2023
StartYr/EndYr/Duration : NA
Duration : 3 years
Status : Ongoing

98. Project Title : On-the-Fly Chemical Dynamics Simulations in Gas and Condensed Phase Molecular Systems Using Machine Learning Approach
Sponsoring Agency : SERB
PI : Dr. Amit Kumar Paul
Department : Chemical & Biological Sciences
Sanction Amount : 48,11,400.00
Financial year of Sanction : 2022-2023
StartYr/EndYr/Duration : NA
Duration : 3 years
Status : Ongoing

99. Project Title : Development of support vector machines based software for cavitation level monitoring in a Francis turbine
Sponsoring Agency : CPRI- Ministry of Power
PI : Dr. Tanmoy Bose
Department : Mechanical Engineering
Sanction Amount : 29,90,000.00
Financial year of Sanction : 2022-2023
StartYr/EndYr/Duration : NA
Duration : 2 years
Status : Transfer

100. Project Title : Gainful Utilization of Overburden Mining Waste Generated During Limestone Mining in Meghalaya Region as Flexible Pavement Material
Sponsoring Agency : SERB
PI : Dr. Pradeep Kumar Gautam
Department : Civil Engineering
Sanction Amount : 38,25,800.00
Financial year of Sanction : 2022-2023
StartYr/EndYr/Duration : NA
Duration : 3 years
Status : Ongoing

101. Project Title : Development of On Chip MEMS Pressure Sensor based Tensiometer for Agriculture (SMDP-C2S)
Sponsoring Agency : MeitY
PI : Dr. P. Rangababu
Department : Electronics & Communication Engineering
Sanction Amount : 1,10,98,000.00
Financial year of Sanction : 2023-2024
StartYr/EndYr/Duration : NA
Duration : 5 years
Status : Ongoing