1. Project Title : Design and development of DSP / FPGA based digital controller for hybrid active power filter applied to Industrial non-linear loads in distribution system.
Sponsoring Agency : SERB-DST PI : Prof. Gayadhar Panda Department : Electrical Engineering Sanction Amount : 22,98,000.00 Financial year of Sanction : 2011-2012 StartYr/EndYr/Duration : NA Duration : 3 years Status : Completed
|
2. Project Title : Rehabilitation of RC beam-column connections by epoxy resin injection and FRP sheets wrapping
Sponsoring Agency : SERB-DST PI : Dr. Comingstarful Marthong Department : Civil Engineering Sanction Amount : 20,88,000.00 Financial year of Sanction : 2014-2015 StartYr/EndYr/Duration : NA Duration : 3 Years Status : Completed
|
3. Project Title : Biodegradation of pulp and paper mill waste using different composting techniques
Sponsoring Agency : SERB-DST PI : Dr. Meena Khwairakpam Department : Civil Engineering Sanction Amount : 32,93,000.00 Financial year of Sanction : 2014-2015 StartYr/EndYr/Duration : NA Duration : 3 Years Status : Completed
|
4. Project Title : Technology Transfer of Betel Nut cutter and Briquette making machine
Sponsoring Agency : Rural Technology Action Group (RuTAG-NE) PI : Dr. Deba Kumar Sarma Department : Mechanical Engineering Sanction Amount : 1,80,000.00 Financial year of Sanction : 2015-2016 StartYr/EndYr/Duration : NA Duration : 1 year Status : Completed
|
5. Project Title : Seismic vulnerability assessment of school buildings of East Khasi Hills District of Meghalaya and the methods for reducing it
Sponsoring Agency : SDMA-Govt. of Meghalaya PI : Dr. Comingstarful Marthong Department : Civil Engineering Sanction Amount : 9,12,000.00 Financial year of Sanction : 2015-2016 StartYr/EndYr/Duration : NA Duration : 2 years Status : Completed
|
6. Project Title : Efficient Multi-dimensional Qubit Placement in Quantum Circuits
Sponsoring Agency : SERB-DST PI : Dr. Kamalika Datta Department : Computer Science And Engineering Sanction Amount : 14,82,900.00 Financial year of Sanction : 2015-2016 StartYr/EndYr/Duration : NA Duration : 3 years Status : Completed
|
7. Project Title : Ultra Low Power Multi Array 64K X 16 Dual Bit associative memory with partial matching capability
Sponsoring Agency : SERB-DST PI : Dr. Anup Dandapat Department : Electronics & Communication Engineering Sanction Amount : 26,30,000.00 Financial year of Sanction : 2015-2016 StartYr/EndYr/Duration : NA Duration : 3 years Status : Completed
|
8. Project Title : Transition metal catalyzed cleavage of carbon-carbon bonds: synthetic, mechanistic and theoretical studies
Sponsoring Agency : SERB-DST PI : Dr. Paresh Nath Chatterjee Department : Chemical & Biological Sciences Sanction Amount : 24,70,000.00 Financial year of Sanction : 2015-2016 StartYr/EndYr/Duration : NA Duration : 3 years Status : Completed
|
9. Project Title : Development of 3-D Supramolecular Structure-Based Optoelectronic Materials Towards Photovoltaic Devices
Sponsoring Agency : DST _ Indo Korea PI : Dr. Gitish Kishor Dutta Department : Chemical & Biological Sciences Sanction Amount : 2765560 Financial year of Sanction : 2015-2016 StartYr/EndYr/Duration : NA Duration : 3 years Status : Completed
|
10. Project Title : Diketopyrrolopyrrole and isoindigo based luminescent conjugated polymers for colorimetric and fluorogenic sensors
Sponsoring Agency : SERB-DST PI : Dr. Gitish Kishor Dutta Department : Chemical & Biological Sciences Sanction Amount : 22,38,000.00 Financial year of Sanction : 2015-2016 StartYr/EndYr/Duration : NA Duration : 3 years Status : Completed
|
11. Project Title : Special Manpower Development Programme for Chips to System Design (SMDP-C2SD)
Sponsoring Agency : MeitY PI : Dr. Anup Dandapat Department : Electronics & Communication Engineering Sanction Amount : 94,04,000.00 Financial year of Sanction : 2015-2016 StartYr/EndYr/Duration : NA Duration : 5 years Status : Completed
|
12. Project Title : Pulses in Spatial Population Dynamics
Sponsoring Agency : Indo-French Centre for Applied Mathematics (IFCAM) PI : Dr. Bapan Ghosh Department : Mathematics Sanction Amount : 7,00,000.00 Financial year of Sanction : 2015-2016 StartYr/EndYr/Duration : NA Duration : 1 year Status : Transfer
|
13. Project Title : Modeling and Control of the hydraulically actuated Ring Inlet Guide Vane of Francis Turbine by Adaptive Neural Network Sliding mode Controller Design
Sponsoring Agency : DST-SERB PI : Dr. Bikash Kumar Sarkar Department : Mechanical Engineering Sanction Amount : 30,42,600.00 Financial year of Sanction : 2015-2016 StartYr/EndYr/Duration : NA Duration : 3 year Status : Completed
|
14. Project Title : Parallel Model Checking of Hybrid Systems
Sponsoring Agency : SERB-DST PI : Dr. Rajarshi Ray Department : Computer Science And Engineering Sanction Amount : 21,75,600.00 Financial year of Sanction : 2015-2016 StartYr/EndYr/Duration : NA Duration : 3 years
|
15. Project Title : Investigation of Dynamic Reconfigurable Issues in Cryptographic Algorithm Implementation on FPGA Platform
Sponsoring Agency : DEITY PI : Dr. Kamalika Datta Department : Computer Science And Engineering Sanction Amount : 15,00,000.00 Financial year of Sanction : 2015-2016 StartYr/EndYr/Duration : NA Duration : 1 year 3 months Status : Completed
|
16. Project Title : Design Innovation Center (DIC)-Spoke
Sponsoring Agency : MHRD through DIC (HUB) IITGuwahati PI : Dr. D.K. Sarma Department : Mechanical Engineering Sanction Amount : 1,00,00,000.00 Financial year of Sanction : 2016-2022 StartYr/EndYr/Duration : NA Duration : 5 years Status : Ongoing
|
17. Project Title : Provision of Frequency Regulation using V2G Control and HVDC transmission Links with Virtual Synchronous Power concept
Sponsoring Agency : SERB-DST PI : Dr. Sanjoy Debbarma Department : Electrical Engineering Sanction Amount : 10,00,000.00 Financial year of Sanction : 2016-2017 StartYr/EndYr/Duration : NA Duration : 2 years Status : Completed
|
18. Project Title : Smart Biomimetic molecular crystal of energy conversion
Sponsoring Agency : SERB-DST PI : Dr. Naba Kamal Nath Department : Chemical & Biological Sciences Sanction Amount : 37,07,000.00 Financial year of Sanction : 2016-2017 StartYr/EndYr/Duration : NA Duration : 3 years Status : Completed
|
19. Project Title : An investigation into the molecular interaction of dietary polyphenols with hen egg white lysozyme using biophysical techniques
Sponsoring Agency : SERB-DST PI : Dr. Atanu Singha Roy Department : Chemical & Biological Sciences Sanction Amount : 36,69,000.00 Financial year of Sanction : 2016-2017 StartYr/EndYr/Duration : NA Duration : 3 Years Status : Completed
|
20. Project Title : Modeling, Dynamics and Benefits of Marine Protected Areas
Sponsoring Agency : SERB DST (indo-Russian) PI : Dr. Bapan Ghosh Department : Mathematics Sanction Amount : 14,69,600.00 Financial year of Sanction : 2016-2017 StartYr/EndYr/Duration : NA Duration : 3 year Status : Transfer
|
21. Project Title : Synchrophasor Sensing and Seamless Control of Smart Distribution Network with Renewable Energy Integration
Sponsoring Agency : RECTPCL PI : Prof. Gayadhar Panda Department : Electrical Engineering Sanction Amount : 1,31,75,000.00 Financial year of Sanction : 2016-2017 StartYr/EndYr/Duration : NA Duration : 3 years Status : Ongoing
|
22. Project Title : Development of CAD Tools for Synthesis, Optimization and Verification of Digital Circuits using Memristors (Indo-Austria)
Sponsoring Agency : SERB-DST PI : Dr. Kamalika Datta Department : Computer Science And Engineering Sanction Amount : 8,65,500.00 Financial year of Sanction : 2016-2017 StartYr/EndYr/Duration : NA Duration : 2 Years Status : Completed
|
23. Project Title : Thermal Detection of Malignancy and Estimation of Its Properties in a Human Breast
Sponsoring Agency : SERB-DST PI : Dr. Koushik Das Department : Mechanical Engineering Sanction Amount : 17,45,984.00 Financial year of Sanction : 2016-2017 StartYr/EndYr/Duration : NA Duration : 3 Years Status : Completed
|
24. Project Title : Novel Biocompatible Nanocomposites for SERS Based Sensing of Biomolecules and Toxic Metal Ions
Sponsoring Agency : SERB-DST PI : Dr. Mukul Pradhan Department : Chemical & Biological Sciences Sanction Amount : 83,00,000.00 Financial year of Sanction : 2016-2017 StartYr/EndYr/Duration : NA Duration : 5 Years Status : Transfer
|
25. Project Title : Cost effective combination of t-head groynes for river bank protection
Sponsoring Agency : SERB-DST PI : Dr. Hriday Mani Kalita Department : Civil Engineering Sanction Amount : 19,16,150.00 Financial year of Sanction : 2016-2017 StartYr/EndYr/Duration : NA Duration : 3 years Status : Completed
|
26. Project Title : Design & development of an intelligent controller for a Vienna Rectifier based grid-connected hybrid energy conversion system comprising of wind & solar energy sources.
Sponsoring Agency : SERB-DST PI : Dr. Atanu Banerjee Department : Electrical Engineering Sanction Amount : 32,77,560.00 Financial year of Sanction : 2016-2017 StartYr/EndYr/Duration : NA Duration : 3 years Status : Completed
|
27. Project Title : Studies on Orthoconic Anti-ferroelectric liquid crystals
Sponsoring Agency : SERB-DST PI : Dr. Ayon Bhattacharjee Department : Physics Sanction Amount : 20,05,520.00 Financial year of Sanction : 2016-2017 StartYr/EndYr/Duration : NA Duration : 3 Years Status : Completed
|
28. Project Title : Modelling and control of the hydraulically actuated ring inlet guide vane of Francis Turbine by Adaptive Neural Network sliding mode Controller Design
Sponsoring Agency : SERB-DST PI : Dr. Bikash Kumar Sarkar Department : Mechanical Engineering Sanction Amount : 30,42,600.00 Financial year of Sanction : 2016-2017 StartYr/EndYr/Duration : NA Duration : 3 years Status : Completed
|
29. Project Title : Application of masking technique and reverse EDM Technique for pattern generation by selective area deposition of material using Powder metallurgical green compact tool and sintered tool electrode
Sponsoring Agency : SERB-DST PI : Dr. Maneswar Rahang Department : Mechanical Engineering Sanction Amount : 2784490 Financial year of Sanction : 2017-2018 StartYr/EndYr/Duration : NA Duration : 3 years Status : Completed
|
30. Project Title : Molecular interactions of the antioxidant polyphenols and their copper complexes with human serum albumin and its glycated analogues
Sponsoring Agency : CSIR PI : Dr. Atanu Singha Roy Department : Chemical & Biological Sciences Sanction Amount : 6,90,000.00 Financial year of Sanction : 2017-2020 StartYr/EndYr/Duration : NA Duration : 3 Year Status : Completed
|
31. Project Title : Application of masking technique and reverse EDM Technique for pattern generation by selective area deposition of material using Powder metallurgical green compact tool and sintered tool electrode
Sponsoring Agency : SERB-DST PI : Dr. Maneswar Rahang Department : Mechanical Engineering Sanction Amount : 27,84,490.00 Financial year of Sanction : 2017-2018 StartYr/EndYr/Duration : NA Duration : 3 years Status : Completed
|
32. Project Title : Structural Behaviour of Lean duplex stainless steel Tubular Beams with web opening
Sponsoring Agency : SERB-DST PI : Dr. M. Longshithung Patton Department : Civil Engineering Sanction Amount : 19,03,990.00 Financial year of Sanction : 2017-2018 StartYr/EndYr/Duration : NA Duration : 3 years Status : Completed
|
33. Project Title : Investigation of Dielectric Properties towards assessment of cros-linked Ployethylene (XLPE) Cable Insulation using Dielectric Response Analysis
Sponsoring Agency : SERB-DST PI : Dr. Supriyo Das Department : Electrical Engineering Sanction Amount : 32,40,072.00 Financial year of Sanction : 2017-2018 StartYr/EndYr/Duration : NA Duration : 3 years Status : Completed
|
34. Project Title : Molecular interactions of the antioxidant polyphenols and their copper complexes with human serum albumin and its glycated analogues
Sponsoring Agency : CSIR PI : Dr. Atanu Singha Roy Department : Chemical & Biological Sciences Sanction Amount : 6,90,000.00 Financial year of Sanction : 2017-2018 StartYr/EndYr/Duration : NA Duration : 3 Years Status : Completed
|
35. Project Title : Cloud-assisted Data Analytics based Real-Time Monitoring and Detection of Water Leakage in Transmission Pipelines using Wireless Sensor Network for Hilly Regions
Sponsoring Agency : NMHS PI : Dr. Vipin Pal Department : Computer Science And Engineering Sanction Amount : 44,70,880.00 Financial year of Sanction : 2017-2018 StartYr/EndYr/Duration : NA Duration : 3 Years Status : Completed
|
36. Project Title : Feasibility study on use of locally available material (low-grade aggregates) for road construction (BRO project Pushpak in Mizoram)
Sponsoring Agency : BRO, Shillong PI : Dr. Comingstarful Marthong Department : Civil Engineering Sanction Amount : 4,95,600.00 Financial year of Sanction : 2017-2018 StartYr/EndYr/Duration : NA Duration : 1 years Status : Completed
|
37. Project Title : Post processing of NQR signals in digital domain in FPGA
Sponsoring Agency : GOI, Board of Research in Nuclear Sciences (BRNS) PI : Dr. P. Rangababu Department : Electronics & Communication Engineering Sanction Amount : 20,03,000.00 Financial year of Sanction : 2018-2019 StartYr/EndYr/Duration : NA Duration : 2 years Status : Ongoing
|
38. Project Title : QM + MM Chemical Dynamics on Chemical Reactions and Non-Adiabatic Processes in Condensed Phase Molecular Systems
Sponsoring Agency : SERB-DST PI : Dr. Amit Kumar Paul Department : Chemical & Biological Sciences Sanction Amount : 36,58,000.00 Financial year of Sanction : 2018-2019 StartYr/EndYr/Duration : NA Duration : 3 years Status : Completed
|
39. Project Title : Non-contact method of vibration as well as velocity parametres estimation based on goertzel algorithm in PLL Technique
Sponsoring Agency : SERB-DST PI : Dr. Ksh Milan Singh Department : Electrical Engineering Sanction Amount : 30,18,000.00 Financial year of Sanction : 2018-2019 StartYr/EndYr/Duration : NA Duration : 3 years Status : Ongoing
|
40. Project Title : Phonetic and psosodic analysis of Khasi language
Sponsoring Agency : SERB-DST PI : Dr. Ch. V Rama Rao Department : Electronics & Communication Engineering Sanction Amount : 16,13,280.00 Financial year of Sanction : 2018-2019 StartYr/EndYr/Duration : NA Duration : 3 Years Status : Ongoing
|
41. Project Title : Investigation on Data-Driven Event Detection using Indian Power Grid's Synchrophasor Data.
Sponsoring Agency : SERB-DST PI : Dr. Diptendu Sinha Roy Department : Computer Science And Engineering Sanction Amount : 19,41,060.00 Financial year of Sanction : 2018-2019 StartYr/EndYr/Duration : NA Duration : 3 Years Status : Ongoing
|
42. Project Title : K-Fusion Frames- Applications to Sensor Network and Coding Theory
Sponsoring Agency : SERB-DST PI : Dr. Saikat Mukherjee Department : Mathematics Sanction Amount : 6,60,000.00 Financial year of Sanction : 2018-2019 StartYr/EndYr/Duration : NA Duration : 3 years Status : Completed
|
43. Project Title : Iterative methods for solving non-square linear systems
Sponsoring Agency : SERB-DST PI : Dr. Manideepa Saha Department : Mathematics Sanction Amount : 17,48,560.00 Financial year of Sanction : 2018-2019 StartYr/EndYr/Duration : NA Duration : 3 years Status : Completed
|
44. Project Title : Fluid dynamical aspects in nuclearing of laser produced nanoparticles in liquids
Sponsoring Agency : SERB-DST PI : Dr. Arpita Nath Department : Physics Sanction Amount : 51,66,893.00 Financial year of Sanction : 2018-2019 StartYr/EndYr/Duration : NA Duration : 3 years Status : Ongoing
|
45. Project Title : On LU-factorization of Generalized M-matrices", funded by Department of Atomic Energy-NBHM.
Sponsoring Agency : Atomic Energy-NBHM. PI : Dr. Manideepa Saha Department : Mathematics Sanction Amount : 14,33,600.00 Financial year of Sanction : 2018-2019 StartYr/EndYr/Duration : NA Duration : 3 years Status : Completed
|
46. Project Title : Development of High Sensitivity CMOS-MEMS Integrated Pressure Sensor and System for Space Application
Sponsoring Agency : ISRO PI : Dr. Pradeep Kumar Rathore Department : Electronics & Communication Engineering Sanction Amount : 32,46,000.00 Financial year of Sanction : 2018-2019 StartYr/EndYr/Duration : NA Duration : 2 years Status : Ongoing
|
47. Project Title : Real Time Control and Energy management for Seamless Operation of DC Microgrid in Grid - Connected and stand Alone
Sponsoring Agency : SERB-DST PI : Prof. Gayadhar Panda Department : Electrical Engineering Sanction Amount : 44,56,450.00 Financial year of Sanction : 2018-2019 StartYr/EndYr/Duration : NA Duration : 3 years Status : Ongoing
|
48. Project Title : Design & Development of a Cost- effective & Energy- efficient Grid- connected Pumped Hydro System employed with Sensor-less PMBLDCM
Sponsoring Agency : CPRI PI : Dr. Atanu Banerjee Department : Electrical Engineering Sanction Amount : 32,90,000.00 Financial year of Sanction : 2018-2019 StartYr/EndYr/Duration : NA Duration : 2 years Status : Completed
|
49. Project Title : Masking of interfering sounds in a crowded environment for hearing aid appilcations
Sponsoring Agency : SERB-DST PI : Dr. Ch. V Rama Rao Department : Electronics & Communication Engineering Sanction Amount : 23,46,447.00 Financial year of Sanction : 2018-2019 StartYr/EndYr/Duration : NA Duration : 3 years Status : Ongoing
|
50. Project Title : Tensionmeter based automated IoT system for irrigation
Sponsoring Agency : DDP-DST PI : Dr. Shubhankar Majumdar Department : Electronics & Communication Engineering Sanction Amount : 16,84,941.00 Financial year of Sanction : 2019-2021 StartYr/EndYr/Duration : NA Duration : 3 years Status : Completed
|
51. Project Title : Prediction Detection and Monitoring System for Landslide in Hilly Region
Sponsoring Agency : DST-IBCD (International Bilateral Cooperation Div PI : Dr. Shubhankar Majumdar Department : Electronics & Communication Engineering Sanction Amount : 6,26,000.00 Financial year of Sanction : 2019-2021 StartYr/EndYr/Duration : NA Duration : 3 Years Status : Completed
|
52. Project Title : Instrumentation, Real Time- Monitoring and Remediation of a steep soil slope stability in Meghalaya
Sponsoring Agency : SERB-DST PI : Dr. Smrutirekha Sahoo Department : Civil Engineering Sanction Amount : 35,03,500.00 Financial year of Sanction : 2019-2020 StartYr/EndYr/Duration : NA Duration : 3 Years Status : Ongoing
|
53. Project Title : Synthesis of biocompatible silver and gold nanoparticles using dietary polyphenols as reducing agents: Further investigation into their binding efficacies with the carrier proteins, biomolecular, detections, anti-bacterial properties and cell cytotoxicity
Sponsoring Agency : SERB-DST PI : Dr. Atanu Singha Roy Department : Chemical & Biological Sciences Sanction Amount : 25,12,400.00 Financial year of Sanction : 2019-2020 StartYr/EndYr/Duration : NA Duration : 3 Years Status : Completed
|
54. Project Title : The Use of e-Writers in Teaching Writing Skill to Special Students of Dwar Jingkyrmen
Sponsoring Agency : ICSSR, New Delhi PI : Dr. P. S. Mangang Department : Humanities & Social Sciences Sanction Amount : 4,00,000/- Financial year of Sanction : 2019-2020 StartYr/EndYr/Duration : NA Duration : 1 year Status : Completed
|
55. Project Title : Assesment of climate change impact on soils and various water of Meghalaya using existing and newer techniques
Sponsoring Agency : DST - CCP PI : Dr. Paresh Nath Chatterjee Department : Chemical & Biological Sciences Sanction Amount : 66,45,175.00 Financial year of Sanction : 2019-2020 StartYr/EndYr/Duration : NA Duration : 3 year Status : Completed
|
56. Project Title : Development of low cost fully -Biodegradable plastic-Bambo Board for structural application
Sponsoring Agency : SCSTE, Meghalaya PI : Dr. Kishore Debnath Department : Mechanical Engineering Sanction Amount : 1,00,000.00 Financial year of Sanction : 2019-2020 StartYr/EndYr/Duration : NA Duration : 1 year Status : Completed
|
57. Project Title : Development and Characterization of Ternary Blended Geopolymer Concrete: A sustainable materials for green construction and technology
Sponsoring Agency : SCSTE, Meghalaya PI : Dr. Dibyendu Adak Department : Civil Engineering Sanction Amount : 99,275.00 Financial year of Sanction : 2019-2020 StartYr/EndYr/Duration : NA Duration : 1 year Status : Completed
|
58. Project Title : Design and fabrication of hand and foot-powered Grain Segregator
Sponsoring Agency : SCSTE, Meghalaya PI : Dr. Maneswar Rahang Department : Mechanical Engineering Sanction Amount : 72,600.00 Financial year of Sanction : 2019-2020 StartYr/EndYr/Duration : NA Duration : 1 year Status : Completed
|
59. Project Title : Design and fabrication of Grain Dryer Machine
Sponsoring Agency : SCSTE, Meghalaya PI : Dr. Maneswar Rahang Department : Mechanical Engineering Sanction Amount : 95,700.00 Financial year of Sanction : 2019-2020 StartYr/EndYr/Duration : NA Duration : 1 year Status : Completed
|
60. Project Title : Master Node Design for Wireless Body Area Network (WBAN)
Sponsoring Agency : SCSTE, Meghalaya PI : Dr. Ksh Milan Singh Department : Electrical Engineering Sanction Amount : 99,960.00 Financial year of Sanction : 2019-2020 StartYr/EndYr/Duration : NA Duration : 1 year Status : Completed
|
61. Project Title : Differentiating Rooftop Rainwater harvesting
Sponsoring Agency : SCSTE, Meghalaya PI : Dr. Susmita Sharma Department : Civil Engineering Sanction Amount : 47,960.00 Financial year of Sanction : 2019-2020 StartYr/EndYr/Duration : NA Duration : 1 year Status : Completed
|
62. Project Title : Lakshym Jal-The water filtration system
Sponsoring Agency : SCSTE, Meghalaya PI : Dr. Susmita Sharma Department : Civil Engineering Sanction Amount : 42,900.00 Financial year of Sanction : 2019-2020 StartYr/EndYr/Duration : NA Duration : 1 year Status : Completed
|
63. Project Title : Solar Based Room Heater Cum food drier with energy Storage Unit
Sponsoring Agency : SCSTE, Meghalaya PI : Dr. Rajat Subhra Das Department : Mechanical Engineering Sanction Amount : 97,834.00 Financial year of Sanction : 2019-2020 StartYr/EndYr/Duration : NA Duration : 1 year Status : Completed
|
64. Project Title : Development of electric carrier to transport the goods in rural Hilly Area
Sponsoring Agency : SCSTE, Meghalaya PI : Dr. Rakesh Roy Department : Electrical Engineering Sanction Amount : 1,00,000.00 Financial year of Sanction : 2019-2020 StartYr/EndYr/Duration : NA Duration : 1 year Status : Completed
|
65. Project Title : Ground Improvement using Waste plastic-coated Bambo Grid (WPBG) Reinforced Soils
Sponsoring Agency : SCSTE, Meghalaya PI : Dr. Smrutirekha Sahoo Department : Civil Engineering Sanction Amount : 1,00,000.00 Financial year of Sanction : 2019-2020 StartYr/EndYr/Duration : NA Duration : 1 year Status : Completed
|
66. Project Title : Cloud-Assisted Hybrid Renewable Energy Sources for Electricity and Water Supply in Rural Area
Sponsoring Agency : SCSTE, Meghalaya PI : Dr. Shubhankar Majumdar Department : Electronics & Communication Engineering Sanction Amount : 99,748.00 Financial year of Sanction : 2019-2020 StartYr/EndYr/Duration : NA Duration : 1 year Status : Completed
|
67. Project Title : Smart Agro Modular System
Sponsoring Agency : SCSTE, Meghalaya PI : Dr. Shubhankar Majumdar Department : Electronics & Communication Engineering Sanction Amount : 46,465.00 Financial year of Sanction : 2019-2020 StartYr/EndYr/Duration : NA Duration : 1 year Status : Completed
|
68. Project Title : Smart Blind Stick
Sponsoring Agency : SCSTE, Meghalaya PI : Dr. Shubhankar Majumdar Department : Electronics & Communication Engineering Sanction Amount : 19,950.00 Financial year of Sanction : 2019-2020 StartYr/EndYr/Duration : NA Duration : 1 year Status : Completed
|
69. Project Title : A Self Sustained Multiple Sensor IoT Based Landslide Detector Early Warning System
Sponsoring Agency : SCSTE, Meghalaya PI : Dr. Shubhankar Majumdar Department : Electronics & Communication Engineering Sanction Amount : 49,335.00 Financial year of Sanction : 2019-2020 StartYr/EndYr/Duration : NA Duration : 1 year Status : Completed
|
70. Project Title : A portable Wind-Hydro Hybrid Electronic Charger Targeted for Outdoor Activities and Military Applications
Sponsoring Agency : SCSTE, Meghalaya PI : Dr. Shubhankar Majumdar Department : Electronics & Communication Engineering Sanction Amount : 49,742.00 Financial year of Sanction : 2019-2020 StartYr/EndYr/Duration : NA Duration : 1 year Status : Completed
|
71. Project Title : Multi-stimuli responsive smart crystalline material derived from organic molecular photoswitch"
Sponsoring Agency : SERB-DST PI : Dr. Naba Kamal Nath Department : Chemical & Biological Sciences Sanction Amount : 31,72,400.00 Financial year of Sanction : 2019-2020 StartYr/EndYr/Duration : NA Duration : 3 Years Status : Completed
|
72. Project Title : Design & Development of High frequency Multilevel Resonant Inverter based New Generation Induction Heated Autoclave System for Sterilization of Surgical Instrumentssponsored by MEitY, Govt. of India under NaMPET-III
Sponsoring Agency : Meity PI : Dr. Atanu Banerjee Department : Electrical Engineering Sanction Amount : 25,00,000.00 Financial year of Sanction : 2019-2020 StartYr/EndYr/Duration : NA Duration : 2 years Status : Ongoing
|
73. Project Title : Low cost faster & accurate low velocity impact damage imaging along with the depth profiling for carbon fibre reinforced composite materials using vibro-thermography
Sponsoring Agency : SERB-DST PI : Dr. Tanmoy Bose Department : Mechanical Engineering Sanction Amount : 45,33,653.00 Financial year of Sanction : 2019-2020 StartYr/EndYr/Duration : NA Duration : 3 years Status : Transfer
|
74. Project Title : The Use of e-Writers in Teaching Writing Skill to Special Students of Dwar Jingkyrmen
Sponsoring Agency : ICSSR, New Delhi PI : Dr. Paonam Sudeep Mangang Department : Humanities & Social Sciences Sanction Amount : 4,00,000.00 Financial year of Sanction : 2019-2020 StartYr/EndYr/Duration : NA Duration : 1 year Status : Completed
|
75. Project Title : Exploring High Density Magnetic Medium in Nanocrystalline Spinel Ferrites for Mganetic Recording Systems
Sponsoring Agency : DST-SERB PI : Dr. Tribedi Bora Department : Physics Sanction Amount : 21,71,730.00 Financial year of Sanction : 2019-2020 StartYr/EndYr/Duration : NA Duration : 3 Years Status : Completed
|
76. Project Title : Post Transition State Dynamics on Chemical Reactions and the Effect of Solvation
Sponsoring Agency : CSIR PI : Dr. Amit Kumar Paul Department : Chemical & Biological Sciences Sanction Amount : 13,96,000.00 Financial year of Sanction : 2019-2020 StartYr/EndYr/Duration : NA Duration : 3 Years Status : Completed
|
77. Project Title : Development of E-Mode III- Nitride devices for energy devices tride devices for energy optimized agile power electronics
Sponsoring Agency : DST/INT/Czech PI : Dr. Shubhankar Majumdar Department : Electronics & Communication Engineering Sanction Amount : 2776906 Financial year of Sanction : 2020-2021 StartYr/EndYr/Duration : NA Duration : 3 Years Status : Ongoing
|
78. Project Title : Design of and Development of Intelligent
Algorithms for Analysis and Detection of
Obscene Content and Forgery in the Images
Available in Social Media Platform
Sponsoring Agency : BPR&D PI : Dr. Bunil Kumar Balabantaray Department : Computer Science And Engineering Sanction Amount : 2188800 Financial year of Sanction : 2020-2022 StartYr/EndYr/Duration : NA Duration : 2 years Status : Completed
|
79. Project Title : GAN-based Medical Image Dataset Synthesis for disease prediction
Sponsoring Agency : NVIDIA Hardware Grant PI : Dr. Bunil Kumar Balabantaray Department : Computer Science And Engineering Sanction Amount : 1000000 Financial year of Sanction : 2020-2021 StartYr/EndYr/Duration : NA Duration : Not Specified Status : Ongoing
|
80. Project Title : A Machine Learning Framework for Deploying Mobile Edge Clouds for Real-Time Analytics on IoT Data over 5G
Sponsoring Agency : Ministry of Electronics & Information Technology E PI : Dr. Diptendu Sinha Roy Department : Computer Science And Engineering Sanction Amount : 45,00,000.00 Financial year of Sanction : 2020-2021 StartYr/EndYr/Duration : NA Duration : 3 years Status : Ongoing
|
81. Project Title : Development of a novel solar driven dedicated outdoor air system (DOAS) for space heating and liquid desicant dehumidification with direct/indirect contact heat/mass exchangeers for Meghalaya region
Sponsoring Agency : SERB_DST PI : Dr. Rajat Subhra Das Department : Mechanical Engineering Sanction Amount : 32,41,700.00 Financial year of Sanction : 2020-21 StartYr/EndYr/Duration : NA Duration : 3 years Status : Ongoing
|
82. Project Title : Design and Development of highly sensitive Non-Conventional Ring Channel Shaped MOSFET based current mirror integrated pressure sensors
Sponsoring Agency : DST/TDT/DDP PI : Dr. Pradeep Kumar Rathore Department : Electronics & Communication Engineering Sanction Amount : 44,93,601.00 Financial year of Sanction : 2021-2022 StartYr/EndYr/Duration : NA Duration : 3 years Status : Ongoing
|
83. Project Title : Air Quality network for SMART City: Real-time air quality monitor, evaluation, and prediction of air pollutants using Machine Learning through the deployment of low-cost air quality sensor (LAQS) in India and two selected ASEAN countries (Malaysia, Philippines).
Sponsoring Agency : ASEAN-India STI Cooperation PI : Dr. Shubhankar Majumdar Department : Electronics & Communication Engineering Sanction Amount : 26,25,696 Financial year of Sanction : 2021-2022 StartYr/EndYr/Duration : NA Duration : 2 years Status : Ongoing
|
84. Project Title : Bound on sterile neutrino decay width and mixing angle with active neutrino using global 21-cm absorption signal..
Sponsoring Agency : SERB-DST PI : Dr. Alekha Chandra Nayak, Department : Physics Sanction Amount : 11,27,522.00 Financial year of Sanction : 2021-2022 StartYr/EndYr/Duration : NA Duration : 2 years Status : Ongoing
|
85. Project Title : Modeling of endothelial glycocalyx (EGL) and transport of low-density lipoprotein Modeling of endothelial glycocalyx (EGL) and transport of low-density lipoprotein
(LDL) in artery: anisotropic porous medium approach.
Sponsoring Agency : SERB-DST PI : Dr. Timir Karmakar, Department : Mathematics Sanction Amount : 13,73,372.00 Financial year of Sanction : 2021-2022 StartYr/EndYr/Duration : NA Duration : 2 years Status : Ongoing
|
86. Project Title : Development and Testing of Solar Photovoltaic (PV) Assisted Hybrid Double- Slope Desalination Solar Still for Off-grid Rural-North East India
Sponsoring Agency : SERB-DST PI : Dr. Biplab Kumar Debnath Department : Mechanical Engineering Sanction Amount : 29,00,909.00 Financial year of Sanction : 2021-2022 StartYr/EndYr/Duration : NA Duration : 3 years Status : Ongoing
|
87. Project Title : A Deep Learning Approach for Preservation of Cultural Heritage
Sponsoring Agency : SERB-DST PI : Dr. Bunil Kumar Balabantaray Department : Computer Science And Engineering Sanction Amount : 23,91,345.00 Financial year of Sanction : 2021-2022 StartYr/EndYr/Duration : NA Duration : 3 years Status : Ongoing
|
88. Project Title : Transport of a dimer in an inhomegenous ratchet with spatially varying friction coefficient
Sponsoring Agency : SERB-DST PI : Dr. Wandahun Longtrai Reenbohn Department : Physics Sanction Amount : 35,03,791.00 Financial year of Sanction : 2021-2022 StartYr/EndYr/Duration : NA Duration : 3 years Status : Ongoing
|
89. Project Title : Coating of Hafnium on Copper to Use as Nuclear Reactor Control Rod
Sponsoring Agency : SERB-DST PI : Dr. Maneswar Rahang Department : Mechanical Engineering Sanction Amount : 25,06,920.00 Financial year of Sanction : 2021-2022 StartYr/EndYr/Duration : NA Duration : 3 years Status : Ongoing
|
90. Project Title : Structural Integrity Assesment considering residual/ reactive stresses due to different welding configurations for high strength steel
Sponsoring Agency : NMRL PI : Dr. Dababrata Podder Department : Civil Engineering Sanction Amount : 1000000 Financial year of Sanction : 2021-2022 StartYr/EndYr/Duration : NA Duration : 18 months Status : Ongoing
|
91. Project Title : Enhancement of Dermo Choice Application- UI Refinement, Computation API and Privacy Policy
Sponsoring Agency : CHOWIS, SOUTH KOREA PI : Dr. Bunil Kumar Balabantaray Department : Computer Science And Engineering Sanction Amount : 205200 Financial year of Sanction : 2022 StartYr/EndYr/Duration : NA Duration : 2 months Status : Completed
|
92. Project Title : Performance Enhancement of Underwater Marine Propellers by use of Additional Appendages
Sponsoring Agency : TIH, IIT Guwahati PI : Dr. Subhendu Maity Department : Mechanical Engineering Sanction Amount : 8,00,000 + JRF Financial year of Sanction : 2022-2023 StartYr/EndYr/Duration : NA Duration : 2 years Status : Ongoing
|
93. Project Title : An artificial intelligence approach to solve waste management challenges
Sponsoring Agency : Ficha, France PI : Dr. Bunil Kumar Balabantaray Department : Computer Science And Engineering Sanction Amount : 1,31,45,235 Financial year of Sanction : 2022-2024 StartYr/EndYr/Duration : NA Duration : 2 years Status : Ongoing
|
94. Project Title : Fully acoustics testing of low velocity impact damage in composite plate using the concept of local defect resonance
Sponsoring Agency : Ministry of Defence PI : Dr. Tanmoy Bose Department : Mechanical Engineering Sanction Amount : 24,02,800.00 Financial year of Sanction : 2022-2023 StartYr/EndYr/Duration : NA Duration : 3 years Status : Transfer
|
95. Project Title : Photocurrent performance of ion implanted Iron Pyrite (FeS2) thin flim as hole transport layer for the CZTS based solar Cell
Sponsoring Agency : Inter-University Accelerator Centre PI : Dr. K. Senthilkumar Department : Physics Sanction Amount : 1,41,935.00 Financial year of Sanction : 2022-2023 StartYr/EndYr/Duration : NA Duration : 3 years Status : Ongoing
|
96. Project Title : Extraction of Pineapple Leaf Fiber and Use It for the Development of Low-Cost Products
Sponsoring Agency : NECTAR PI : Dr. Kishore Debnath Department : Mechanical Engineering Sanction Amount : 12,65,880.00 Financial year of Sanction : 2022-2023 StartYr/EndYr/Duration : NA Duration : 1 year Status : Ongoing
|
97. Project Title : Investigating Self-Healing Capability And Performance of HMA Mixes Containing Steel Slag As Aggregates
Sponsoring Agency : SERB PI : Dr. Pradeep Kumar Gautam Department : Civil Engineering Sanction Amount : 3531000 Financial year of Sanction : 2022-2023 StartYr/EndYr/Duration : NA Duration : 3 years Status : Ongoing
|
98. Project Title : On-the-Fly Chemical Dynamics Simulations in Gas and Condensed Phase Molecular Systems Using Machine Learning Approach
Sponsoring Agency : SERB PI : Dr. Amit Kumar Paul Department : Chemical & Biological Sciences Sanction Amount : 48,11,400.00 Financial year of Sanction : 2022-2023 StartYr/EndYr/Duration : NA Duration : 3 years Status : Ongoing
|
99. Project Title : Development of support vector machines based software for cavitation level monitoring in a Francis turbine
Sponsoring Agency : CPRI- Ministry of Power PI : Dr. Tanmoy Bose Department : Mechanical Engineering Sanction Amount : 29,90,000.00 Financial year of Sanction : 2022-2023 StartYr/EndYr/Duration : NA Duration : 2 years Status : Transfer
|
100. Project Title : Gainful Utilization of Overburden Mining Waste Generated During Limestone Mining in Meghalaya Region as Flexible Pavement Material
Sponsoring Agency : SERB PI : Dr. Pradeep Kumar Gautam Department : Civil Engineering Sanction Amount : 38,25,800.00 Financial year of Sanction : 2022-2023 StartYr/EndYr/Duration : NA Duration : 3 years Status : Ongoing
|
101. Project Title : Development of On Chip MEMS Pressure Sensor based Tensiometer for Agriculture (SMDP-C2S)
Sponsoring Agency : MeitY PI : Dr. P. Rangababu Department : Electronics & Communication Engineering Sanction Amount : 1,10,98,000.00 Financial year of Sanction : 2023-2024 StartYr/EndYr/Duration : NA Duration : 5 years Status : Ongoing
|